Looking Back at 2011

Contributed by: Mindrolling International News Staff
Published: 12 January 2012

Roads and Drainage Projects


ROAD IMPROVEMENT

The Karma Family was also instrumental in planning and coordinating the very successful road improvement project. Fully renovated through the generosity of our sangha members, this work was completed in two phases. Now our once crumbling roads are elegant, safe, and much enjoyed by those walking the land.

Paving the road in front of the Orchard House in June.
Karma team coordinated the road improvement project.
Newly paved road leads past the Buddha Park and up to the main residence.

DRAINAGE SYSTEM

This year some much needed work was done all around the land to improve our drainage system. The heavy rainfall in spring and early summer spurred the Karma team into improving all the drainage systems, particularly those near the Main Shrineroom, Dekyi Extension and the Buddha Park. Residents manually hauled several tons of stones from the back field of Lotus Gardens for weeks to complete the drains which greatly helped prevent erosion and protected the land when the hurricane season arrived.



Chris Jarmon places a stone in the drainage system being repaired by the Dekyi Extension.
Drainage work underway down the hill from the Main Shrineroom.
Large gravel placed over pipe on either side of the road, aids
in a controlled drainage of water which will help prevent erosion.
The Karma team installs a drainage pipe under the road near the Main Shrine Room.
Drainage system installed in the Buddha Park.